Ben Gezon

White Lake Dock & Dredge vessels completing Manistique OU2 project

Manistique River AOC – OU2 Zones 5 & 6

Posted in

Project Summary LOCATION: MANISTIQUE, MICHIGAN DATES: APRIL 2019 – DECEMBER 2019 CONTRACT VALUE: $10,500,000 ROLE: PRIMARY CONTRACTOR DREDGING This project involved the dredging of approximately 42,000 cubic yards PCB impacted sediment. Approximately 1,100 cubic yards was TSCA level hazardous material. The materials were removed from various dredge management units within the outer harbor and river…

Read More
Dredging & Capping on the Ashtabula River AOC

Ashtabula River AOC – Dredging & Capping

Posted in

Project Summary LOCATION: ASHTABULA, OHIO DATES: NOVEMBER 2012 – NOVEMBER 2013 CONTRACT VALUE: $3,000,000 ROLE: SUB CONTRACTOR DREDGING Approximately 120,000 cy of organic silts impacted with PCB’s, metals, and PAH compounds were mechanically dredged. In addition, White Lake mechanically dredged approximately 11,500 cy of sand/gravel from non-impacted portions of the AOC. Our purpose built fleet…

Read More
Capping in the Duluth Superior Harbor

Duluth Superior Harbor – Slips 3 & C Remedial Cap

Posted in

Project Summary LOCATION: DULUTH, MINNESOTA DATES: AUGUST 2018 – DECEMBER 2018 CONTRACT VALUE: $3,000,000 ROLE: PRIMARY CONTRACTOR DREDGING This project involved the dredging of approximately 27,000 cubic yards of clean sand from an area of Duluth Harbor designated as “East Gate”. The dredging consisted primarily of clean, silty, sand. Very little soft, organic, sediment was…