Project Summary LOCATION: MANISTIQUE, MICHIGAN DATES: APRIL 2019 – DECEMBER 2019 CONTRACT VALUE: $10,500,000 ROLE: PRIMARY CONTRACTOR DREDGING This project involved the dredging of approximately 42,000 cubic yards PCB impacted sediment. Approximately 1,100 cubic yards was TSCA level hazardous material. The materials were removed from various dredge management units within the outer harbor and river…
Read MoreProject Summary LOCATION: ASHTABULA, OHIO DATES: NOVEMBER 2012 – NOVEMBER 2013 CONTRACT VALUE: $3,000,000 ROLE: SUB CONTRACTOR DREDGING Approximately 120,000 cy of organic silts impacted with PCB’s, metals, and PAH compounds were mechanically dredged. In addition, White Lake mechanically dredged approximately 11,500 cy of sand/gravel from non-impacted portions of the AOC. Our purpose built fleet…
Read MoreProject Summary LOCATION: DULUTH, MINNESOTA DATES: AUGUST 2018 – DECEMBER 2018 CONTRACT VALUE: $3,000,000 ROLE: PRIMARY CONTRACTOR DREDGING This project involved the dredging of approximately 27,000 cubic yards of clean sand from an area of Duluth Harbor designated as “East Gate”. The dredging consisted primarily of clean, silty, sand. Very little soft, organic, sediment was…
Read More